News

Explore the world of power products and stay informed about the latest reference projects, news, events and company information.

Record-breaking order for TAURON Dystrybucja

Łódź, Poland, July 2018 – ZREW will supply 54 power transformers for TAURON Dystrybucja, one of the biggest distribution network operators in Poland. The company distributes energy to about 5,5 million people and covers 25% of the whole electricity grid in Poland. It is the largest individual order in the history of ZREW.

Tramway Casablanca

Subbiano Arezzo, Italy, July 2018 – In view to the development plan of the public transport that will connect 3 million inhabitants in the metropolitan area of Casablanca by 2030, a new tram line and an extension of an existing tram line were introduced. To make sure the tram lines are supplied with power and bring you comfortably from destination to destination, Tesar provided not only cast resin transformers but also oil immersed transformers.

Power supply for the Football World Cup 2022

Dubai, United Arab Emirates, July 2018 – For the first time in the history of the FIFA Football World Cup, the tournament in 2022 will be hold in the Middle East. The beautifully designed stadiums in Qatar will not only make sure you will have an unforgettable experience but also ensure safety and energy efficiency. To make sure power is given at any time, Tesar will supply over 180 cast resin transformers – so you can enjoy the football match without worrying about anything else.

Successful three days at Powertage 2018

Sissach, Switzerland, June 2018 – With more than 2,000 visitors from all over Switzerland, the Powertage in Zurich is one of the most important events for the Swiss electricity industry and the ideal contact platform for Rauscher & Stoecklin. From apprentices to engineers – here is the opportunity to maintain existing contacts and create new exciting leads.

New assembly method for disconnectors

Plzeň, Czech Republic, June 2018 – The German energy company E.ON Avacon has awarded SERW with a new project. The companies share a long-time partnership and have realized more than 44 projects together. On 28 February 2018, E.ON Avacon contacted SERW with the demand for a new assembly method for disconnectors at their substation in Leherheide, Germany.

Chiasso Substation

Subbiano Arezzo, Italy, June 2018 – With a view to increasing the traffic volume of the Swiss-Italian Gotthard corridor, a new substation for electrical power (SSE) has been built in Chiasso (CO) on the border between Italy and Switzerland, operating since 27 May 2018. The purpose of this SSE is the AC/DC conversion for the powering of trains circulating in the Swiss railway networks.

Power transformers for the most modern gas and steam block in Poland

Łódź, Poland, June 2018 – The year 2018 brings new challenges and engagements in large projects in the Polish energy sector. One of them is the participation in the creation of the most modern gas and steam block in Poland, which will be built at the Żerań Heat and Power Plant in Warsaw. The block will provide heat supply for Warsaw and increase electricity production in the Heat and Power Plant by approx. 80 percent.

The Louvre in Abu Dhabi

Dubai, United Arab Emirates, May 2018 – After years of construction the Louvre in Abu Dhabi was inaugurated in November 2017. In order to keep your visit as pleasant as possible and the antique work of art well-tempered in perfect atmospheric humidity so it will remain for the next generations, uninterrupted power supply is crucial.

Muscat International Airport in Oman

Dubai, United Arab Emirates, May 2018 – During the night between 20 and 21 March 2018, the new Muscat International Airport in Oman was put into operation. Spread across an area of 335.000 sqm, the new airport is able to handle more than 20 million passengers per year, with plans to increase the capacity up to 48 million in the future.

Page 6 of 6