{"id":5598,"date":"2018-07-30T13:40:01","date_gmt":"2018-07-30T13:40:01","guid":{"rendered":"http:\/\/the-rsgroup.com\/?p=5598"},"modified":"2020-01-23T10:30:50","modified_gmt":"2020-01-23T10:30:50","slug":"matterhorn-region-switzerland","status":"publish","type":"post","link":"https:\/\/the-rsgroup.com\/fr\/matterhorn-region-switzerland\/","title":{"rendered":"Matterhorn region Switzerland"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text]<span style=\"color: #5587c8;\">Sissach, Switzerland, July 2018 \u2013<\/span>\u00a0Two <a href=\"https:\/\/the-rsgroup.com\/products\/transformers\/distribution-transformers\">coupling transformers<\/a> were put into operation at a height of 2\u2019939m in the Matterhorn region of Switzerland. The complex transport operation started in the early morning in order to prevent any disturbance of the visitors. With the help of the local ropeway, the transformers reached their final destination at a height of 2\u2019939m.<\/p>\n<p>At the beginning of July 2018, <a href=\"https:\/\/the-rsgroup.com\/rauscher-stoecklin\">Rauscher &amp; Stoecklin<\/a> delivered two coupling transformers to Zermatt, Switzerland. With the transportation partner company, Michel Krantrans GmbH, the two transformers were brought up to the bottom station &#8220;Furi&#8221; with a height of 1\u2019867m. From there, the transportation continued with the ropeway to the station \u201cTrockener Steg\u201d at a height of 2&#8217;939m where the transformers have been installed.<\/p>\n<p>The installation of the two 2500kVA transformers pursued different objectives:<br \/>\n\u2022 Separation of impedances<br \/>\n\u2022 Improvement of selectivity<br \/>\n\u2022 Voltage increase and adjustment<\/p>\n<p>Simplified: The galvanic isolation from the electrical network operating installations in the mountain to the electrical distribution network of the village of Zermatt.<\/p>\n<p>The customer, <a href=\"http:\/\/www.ewzermatt.ch\/\" target=\"_blank\" rel=\"noopener noreferrer\">Elektrizit\u00e4tswerk Zermatt<\/a>, has been committed to the quality of Rauscher &amp; Stoecklin for years. Thanks to the high-quality products and the smooth transport operation, the customer was again fully satisfied with the provided solution.<\/p>\n<p><span style=\"color: #5587c8;\">About Rauscher &amp; Stoecklin<\/span><br \/>\nRauscher &amp; Stoecklin is part of the Swiss-based R&amp;S Group, a leading provider in selected niches for power products. The company, founded in 1919, is a well-established and experienced manufacturer of transformers, switchgear and other electrical equipment.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][apress_image_slider images=&#8221;6613,6619,6625,6631&#8243; arrows_bg=&#8221;#5587c8&#8243; style=&#8221;slider_style5&#8243; bullet_navigation_style=&#8221;dots_style3&#8243; arrows_style=&#8221;arrows_style3&#8243;]<div class=\"ult-spacer spacer-69ecea3345427\" data-id=\"69ecea3345427\" data-height=\"30\" data-height-mobile=\"30\" data-height-tab=\"30\" data-height-tab-portrait=\"\" data-height-mobile-landscape=\"\" style=\"clear:both;display:block;\"><\/div>[\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text]Sissach, Switzerland, July 2018 \u2013\u00a0Two coupling transformers were put into operation at a height of 2\u2019939m in the Matterhorn region of Switzerland. The complex transport&hellip;<\/p>\n","protected":false},"author":5,"featured_media":6613,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[48,16],"tags":[],"class_list":["post-5598","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-reference-projects","category-news","reference_country-switzerland","reference_product-distribution-transformer","reference_industry-power-distribution"],"acf":[],"_links":{"self":[{"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/posts\/5598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/comments?post=5598"}],"version-history":[{"count":0,"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/posts\/5598\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/media\/6613"}],"wp:attachment":[{"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/media?parent=5598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/categories?post=5598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/the-rsgroup.com\/fr\/wp-json\/wp\/v2\/tags?post=5598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}