{"id":14848,"date":"2021-09-09T12:20:42","date_gmt":"2021-09-09T12:20:42","guid":{"rendered":"https:\/\/the-rsgroup.com\/?p=14848"},"modified":"2026-10-01T22:37:15","modified_gmt":"2026-10-01T22:37:15","slug":"transformers-for-a-swiss-data-center","status":"publish","type":"post","link":"https:\/\/the-rsgroup.com\/it\/transformers-for-a-swiss-data-center\/","title":{"rendered":"Transformers for a Swiss data center"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"14848\" class=\"elementor elementor-14848\" data-elementor-post-type=\"post\">\n\t\t\t\t<section class=\"elementor-element elementor-element-475cd0c e-con-full e-flex e-con e-parent\" data-id=\"475cd0c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-f2ae8b9 e-con-full e-flex e-con e-child\" data-id=\"f2ae8b9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c74095f elementor-widget elementor-widget-text-editor\" data-id=\"c74095f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #5587c8;\">Sissach, Switzerland, September 2021 \u2013 <a href=\"https:\/\/the-rsgroup.com\/rauscher-stoecklin\/\">Rauscher &amp; Stoecklin<\/a><\/span>, supplied 4 <a href=\"https:\/\/the-rsgroup.com\/products\/transformers\/distribution-transformers\/\">oiled transformers<\/a> to a project run by an independent engineering company <a href=\"https:\/\/www.edico.ch\/\" target=\"_blank\" rel=\"noopener\">EDICO<\/a>. The end customer is one of main Swiss telecommunications providers. The transformers were manufactured for the needs of the new data center in Z\u00fcrich.<\/p>\n<p>Scope and key features of the supply:<\/p>\n<ul>\n<li>4 transformers with 1250 kVA<\/li>\n<li>4 stand\u2013alone oil retention vats<\/li>\n<li>The order included FATs and installation inside a building<\/li>\n<li>Place of installation: data center in Z\u00fcrich<\/li>\n<li>Delivery: July 2021<\/li>\n<\/ul>\n<p>The most difficult stage of the project for Rauscher &amp; Stoecklin turned out to be the final part \u2013 assembly inside the building. The corridors were narrow, and the floor was partially sensitive, so the devices\u2019 transportation had to be carried out very precisely.<\/p>\n<p>To ensure the selection of optimal solutions during the project implementation, Rauscher &amp; Stoecklin used their long-time experience in the manufacturing and installation of transformers. The company looks forward to further cooperation with EDICO. The building will be expanded step-by-step with additional servers, and other transformers will be needed.<\/p>\n<p><span style=\"color: #5587c8;\">About EDICO<\/span><br \/>\nEDICO Engineering AG is a Swiss company that advises and supports companies in the planning of all projects in the field of building electrical engineering. Based on many years of specialist knowledge, EDICO provides solutions for banks, insurance companies, schools, public administration, hospitals and data centers.<\/p>\n<p><span style=\"color: #5587c8;\">About Rauscher &amp; Stoecklin<br \/>\n<\/span>Rauscher &amp; Stoecklin is part of the Swiss-based R&amp;S Group, a leading provider of electrical infrastructure products in key markets. The company, founded in 1919, is a well-established and experienced manufacturer of transformers, switchgear, and other electrical equipment.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/section>\n\t\t<section class=\"elementor-element elementor-element-45d1bc9 e-con-full e-flex e-con e-parent\" data-id=\"45d1bc9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-536058b e-con-full e-flex e-con e-child\" data-id=\"536058b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-eb60f74 rs-slider elementor-pagination-position-inside elementor-arrows-position-inside elementor-widget elementor-widget-image-carousel\" data-id=\"eb60f74\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;infinite&quot;:&quot;yes&quot;,&quot;speed&quot;:900,&quot;effect&quot;:&quot;slide&quot;,&quot;navigation&quot;:&quot;both&quot;,&quot;slides_to_show&quot;:&quot;1&quot;,&quot;slides_to_show_tablet&quot;:&quot;1&quot;,&quot;slides_to_show_mobile&quot;:&quot;1&quot;}\" data-widget_type=\"image-carousel.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-image-carousel-wrapper swiper\" role=\"region\" aria-roledescription=\"carousel\" aria-label=\"Image gallery\" dir=\"ltr\">\n\t\t\t<div class=\"elementor-image-carousel swiper-wrapper swiper-image-stretch\" aria-live=\"polite\">\n\t\t\t\t\t\t\t\t<div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"1 di 7\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" class=\"swiper-slide-image\" src=\"https:\/\/the-rsgroup.com\/wp-content\/uploads\/2021\/09\/ac.jpg\" alt=\"Parte superiore di un trasformatore di distribuzione in olio Rauscher &amp; Stoecklin con collegamenti dei cavi in un data center a Zurigo\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"2 di 7\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" class=\"swiper-slide-image\" src=\"https:\/\/the-rsgroup.com\/wp-content\/uploads\/2021\/09\/ad.jpg\" alt=\"Connettori dei cavi sugli isolatori passanti di un trasformatore in olio Rauscher &amp; Stoecklin in un data center di Zurigo\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"3 di 7\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" class=\"swiper-slide-image\" src=\"https:\/\/the-rsgroup.com\/wp-content\/uploads\/2021\/09\/ae.jpg\" alt=\"Trasformatore di distribuzione in olio Rauscher &amp; Stoecklin da 1250 kVA nella cabina di trasformazione di un data center a Zurigo\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"4 di 7\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" class=\"swiper-slide-image\" src=\"https:\/\/the-rsgroup.com\/wp-content\/uploads\/2021\/09\/af.jpg\" alt=\"Trasformatore in olio Rauscher &amp; Stoecklin con vasca di raccolta dell&#039;olio nella cabina di un data center di Zurigo\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"5 di 7\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" class=\"swiper-slide-image\" src=\"https:\/\/the-rsgroup.com\/wp-content\/uploads\/2021\/09\/5.jpg\" alt=\"Corridoio stretto nell&#039;area tecnica del data center di Zurigo dove sono installati trasformatori Rauscher &amp; Stoecklin\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"6 di 7\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" class=\"swiper-slide-image\" src=\"https:\/\/the-rsgroup.com\/wp-content\/uploads\/2021\/09\/7.jpg\" alt=\"Quadri elettrici nel locale tecnico del data center di Zurigo dotato di trasformatori Rauscher &amp; Stoecklin\" \/><\/figure><\/div><div class=\"swiper-slide\" role=\"group\" aria-roledescription=\"slide\" aria-label=\"7 di 7\"><figure class=\"swiper-slide-inner\"><img decoding=\"async\" class=\"swiper-slide-image\" src=\"https:\/\/the-rsgroup.com\/wp-content\/uploads\/2021\/09\/ab.jpg\" alt=\"Trasformatori di distribuzione in olio Rauscher &amp; Stoecklin in un capannone prima della consegna a un data center di Zurigo\" \/><\/figure><\/div>\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-prev\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 10 18\" width=\"10\" height=\"18\"><path d=\"M9 0.5 L1 9 L9 17.5\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.2\"><\/path><\/svg>\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-swiper-button elementor-swiper-button-next\" role=\"button\" tabindex=\"0\">\n\t\t\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 10 18\" width=\"10\" height=\"18\"><path d=\"M1 0.5 L9 9 L1 17.5\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.2\"><\/path><\/svg>\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-35f72cd elementor-widget elementor-widget-spacer\" data-id=\"35f72cd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Sissach, Switzerland, September 2021 \u2013 Rauscher &amp; Stoecklin, supplied 4 oiled transformers to a project run by an independent engineering company EDICO. The end customer is one of main Swiss telecommunications providers. The transformers were manufactured for the needs of the new data center in Z\u00fcrich. Scope and key features of the supply: 4 transformers [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":14856,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16,48],"tags":[],"reference_country":[94],"reference_product":[103],"reference_industry":[110,109],"class_list":["post-14848","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-reference-projects","reference_country-switzerland","reference_product-distribution-transformer","reference_industry-infrastructure","reference_industry-industry"],"acf":[],"_links":{"self":[{"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/posts\/14848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/comments?post=14848"}],"version-history":[{"count":12,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/posts\/14848\/revisions"}],"predecessor-version":[{"id":46536,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/posts\/14848\/revisions\/46536"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/media\/14856"}],"wp:attachment":[{"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/media?parent=14848"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/categories?post=14848"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/tags?post=14848"},{"taxonomy":"reference_country","embeddable":true,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/reference_country?post=14848"},{"taxonomy":"reference_product","embeddable":true,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/reference_product?post=14848"},{"taxonomy":"reference_industry","embeddable":true,"href":"https:\/\/the-rsgroup.com\/it\/wp-json\/wp\/v2\/reference_industry?post=14848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}